Home / Guides / Three phase power cost in Sydney
A three-phase distribution board with its covers on
Cost guide, Sydney 2026

What does three phase power cost?

Where three phase supply is already connected, a three-phase switchboard costs $3,500–$6,500 in Sydney. Getting three phase to a property that only has single phase is usually $3,000–$8,000, and much more if there are no three phase mains in the street.

Licence 487170CNSW electrical contractor
Fully insuredPublic liability
Local to the Eastern SuburbsOn the road here daily

Three phase costs

Sydney, 2026. The network side is where the range gets wide.

The jobPrice
Three-phase switchboardSupply is three phase already; the board needs to catch up$3,500 – $6,500
Upgrade to three phase supply, overhead serviceThree phase mains already run along the street$3,000 – $5,000
Upgrade to three phase supply, underground serviceExtra trenching and civil work$5,000 – $8,000+
Street has single phase mains onlyThe network has to be augmented — potentially tens of thousandsquote required
Three phase submain to a studio, garage or pool houseOnce the supply and board are sorted$1,200 – $4,000
Load management in place of an upgradeFrequently the cheaper, better answer$300 – $900

Indicative Sydney ranges for 2026, not a quote. Your price depends on your switchboard, access and what we find once we’re on site. We confirm a fixed price before we start, and it doesn’t move.

First, check you actually need it

Three phase is sold more often than it’s needed, so it helps to be clear about what really justifies it:

  • Equipment that requires it — some larger pumps, workshop machinery and commercial-grade gear.
  • A genuine capacity limit — where your combined load is more than a single phase service can carry. In the Eastern Suburbs that’s usually a large harbourside or clifftop home with a pool and spa, ducted air on every level, a lift, an EV charger or two and a battery, all on one supply.
  • Fast EV charging at 11kW or 22kW, or charging two cars at once.

What isn’t a reason: a hope that appliances will “run better”, or a promise of lower bills. Bills are based on the energy you use, not the number of phases delivering it.

Before you commit, ask about load management. Often the real issue is timing, not capacity — the air conditioning, pool pump and EV charger all starting up around 6pm. Managing those loads costs $300–$900 and can make a supply upgrade unnecessary.

Practical notes for the Eastern Suburbs

You may already have it. Larger homes, and terraces that were converted to flats at some point, sometimes already have a three phase supply even though the board only uses one phase properly. A look at the meter and main switch answers that in a minute.

Underground services and tight sites. Where the service comes in underground, or the meter sits at the top of a steep block or a long flight of stairs, the civil work takes more time and pushes a supply upgrade towards the top of the range.

Apartments. Individual units are almost always single phase, and changing that involves the building’s mains and the owners corporation. For an EV charger in a unit, a 7kW single phase charger is nearly always the practical choice.

Three phase questions

What does it cost to go to three phase?

If you already have a three phase supply, the board upgrade is $3,500–$6,500. Converting a single phase property costs $3,000–$8,000, and can cost much more if the street lacks three phase mains and the network has to be extended.

How do I know if I’ve got three phase?

Check the main switch: on a three phase supply it’s a wide switch covering three poles, and you’ll normally see three service cables at the meter. A photo is enough for us to confirm it.

Does three phase make power cheaper?

No. Your bill is for energy used, however it’s delivered. Treat any claim that three phase will cut your bill as a red flag.

How long does the whole process take?

The electrical work itself is a day or two. The application to the network beforehand is what takes time — plan on several weeks.

Is three phase needed for an EV charger?

For a 7kW single phase charger, no — that covers overnight charging for almost every household. For 11kW or 22kW charging, or fast-charging two cars together, yes.

Could load management do the job instead?

Often. When the problem is several big loads switching on at once rather than a true lack of capacity, $300–$900 of load management can avoid a supply upgrade that costs many times as much.

What customers say

★★★★★

Jason solved a really complex problem for our house with excellent professionalism and workmanship. Highly recommend, would def work with him again. On time delivery and within budget.

Raghav Murali-Ganesh · May 2026
★★★★★

Jason onsite quickly and completed the work on the spot, giving us a good price and was very polite. Would highly recommend.

Hans Banneck · March 2026
★★★★★

Fantastic service! Friendly, efficient and well priced. Highly recommend. Thank you for swiftly fixing our switches.

Lynette Haines · August 2025

These are Google reviews for Cync Electrical & Automation. 5.0 from 20 reviews. — see the profile

Someone told you to go three phase?

Get a second opinion before you sign anything. Call 0411 498 916.

No obligation. We’ll review it and get back to you.