What the law says today

Under NSW strata law, EV charging counts as “sustainability infrastructure”. That label matters because it lowers the bar for approval. Most changes to common property need a special resolution, which is 75% support. Sustainability infrastructure needs only a simple majority at a general meeting.

On top of that, from 1 July 2025 an owners corporation can no longer refuse sustainability infrastructure — EV charging included — on aesthetic grounds alone. A proposal can still be knocked back for genuine technical, safety or cost reasons. It can’t be knocked back because someone thinks a wall box will spoil the look of the car park.

Separately, the Strata Schemes Legislation Amendment (Miscellaneous) Bill 2026 was before the NSW Legislative Council as at September 2026, and would strengthen apartment owners’ right to install a charger further. Treat it as pending, not settled — check where it’s up to before relying on it. Everything on this page is general information, not legal advice.

What a strata EV charger install costs

Sydney apartments and units, 2026. A shared car park adds coordination, not necessarily a lot of cost.

The jobPrice
One charger on a dedicated circuit from your sub-boardWhere your car space can be wired back to your own meter$2,500 – $6,000
One charger with its own sub-meterFed from common-property supply and metered so you pay for what you use$3,500 – $7,000
Load-managed chargers across several baysChargers sharing the building’s spare capacity — usually a building-wide projectquote required

Indicative Sydney ranges for 2026, not a quote. The final figure depends on where your car space is, how much spare capacity the building’s supply has and what your owners corporation asks for. We confirm a fixed price before we start, and it doesn’t move.

Getting it approved, step by step

1. Read your by-laws. Some schemes already have an EV charging by-law that covers exactly this. If yours doesn’t, you’re relying on the general sustainability infrastructure rules.

2. Put a motion to the owners corporation. Because it’s sustainability infrastructure, it needs a simple majority rather than the 75% special resolution most common-property work needs.

3. Bring a specific proposal, not a wish. Committees say yes more readily to a scoped plan — the cable route, how it’ll be metered, who pays for what — than to an open request to “put in a charger”.

4. Deal with the valid objections before they’re raised. Looks alone haven’t been grounds for refusal since 1 July 2025. Limited spare supply capacity, a real fire-safety issue or a cost the scheme can’t fairly share still are, so answer them in the proposal.

Wiring and metering in a shared car park

There are two practical ways to supply a charger in a shared basement or garage:

  • A sub-meter on common-property supply. The charger draws from the building’s supply, and its own meter records what you use so you’re billed for it rather than the cost disappearing into the levies. In a building with many owners this is usually the fairest arrangement, and it’s increasingly what committees expect to see.
  • A dedicated circuit back to your own board. Only works where your car space is close enough to your lot, or the building’s cable routes make it possible. Billing is simple because it’s already on your meter, but it isn’t always physically achievable.

Either way, the building’s total spare capacity is the real constraint. One charger rarely troubles a building’s supply. When several owners want one at the same time, load management or a supply upgrade comes into the conversation — and that’s a project for the whole building, not one owner. It’s worth raising early in the larger blocks around Bondi Junction and along the coast, where interest in EVs tends to arrive several owners at a time.

And an honest note: some older walk-up blocks have no off-street parking at all. Without a car space to put a charger in, the strata rules don’t help — public or workplace charging is the practical answer there.

Strata EV charger questions

Can strata refuse my EV charger because of how it looks?

Not since 1 July 2025. Aesthetic grounds alone are no longer a valid reason to refuse sustainability infrastructure, and EV charging is sustainability infrastructure. Genuine technical, safety or cost concerns can still be raised.

Does an EV charger need a special resolution?

No. Because EV charging is classed as sustainability infrastructure, a simple majority at a general meeting is enough, rather than the 75% special resolution most common-property changes need.

What is the Strata Schemes Legislation Amendment (Miscellaneous) Bill 2026?

Proposed NSW legislation that would further strengthen apartment owners’ right to install EV chargers. It was before the Legislative Council as at September 2026. Its status can change, so check its progress before relying on it, and treat this as general information, not legal advice.

How much does an EV charger cost in a strata building?

Usually $2,500–$6,000 for a single charger on a dedicated circuit, or $3,500–$7,000 with its own sub-meter off the building’s supply. A load-managed set-up across several bays is a building-wide project and needs its own quote.

Who pays — me or the owners corporation?

Your own charger and its circuit or sub-meter are normally your cost, like any improvement that serves only your lot. Upgrades to shared infrastructure that several chargers depend on, such as a supply upgrade or building-wide load management, are usually a common-property cost shared by the scheme.

What customers say

★★★★★

Had a great experience with Jason — top guy at what he does. I recommend him.

Tee Micheal's · July 2026
★★★★★

Jason solved a really complex problem for our house with excellent professionalism and workmanship. Highly recommend, would def work with him again. On time delivery and within budget.

Raghav Murali-Ganesh · May 2026
★★★★★

Fantastic service! Friendly, efficient and well priced. Highly recommend. Thank you for swiftly fixing our switches.

Lynette Haines · August 2025

These are Google reviews for Cync Electrical & Automation. 5.0 from 20 reviews. — see the profile

Taking a proposal to your owners corporation?

We’ll scope the install and give you real numbers to put in front of the committee. Call 0411 498 916.

No obligation. We’ll review it and get back to you.