
EV charger installation in the Eastern Suburbs
A garage beside the switchboard is a half-day job. A basement car space three levels below your unit is a strata project. We’ll tell you which one you have before we quote.
What actually sets the price
EV charger quotes vary wildly, and the charger is almost never the reason. These are:
- Where the car parks relative to the switchboard. A garage on the other side of the laundry wall is quick. A rear-lane garage at the bottom of a terrace backyard needs a properly sized cable run under or through everything in between.
- Whether your board has a spare position. A full board means an upgrade first — the single biggest swing in any EV quote.
- House or strata. In an apartment building, the charger usually draws from common property, needs owners corporation approval and often a sub-meter. That’s more coordination, not necessarily much more cable.
- Whether load management is needed. When the supply can’t feed a charger at full rate on top of the rest of the household, a load-managed charger slows down automatically instead of tripping the main switch.
Common situations
Garage or carport right by the switchboard
The easy one. A short cable, its own circuit and RCBO, and the charger fixed to the wall and tested — normally done by lunchtime.
Call 0411 498 916A car space in an apartment basement
The charger normally connects to the building’s supply with a sub-meter so you pay for what you use, or — where the car space is close enough — runs back to your own board. Since 1 July 2025, NSW owners corporations can’t refuse EV charging on looks alone, and approval needs only a simple majority. We prepare the scoped proposal committees actually want to see.
Call 0411 498 916Rear-lane garage behind a terrace
Needs a correctly sized submain from the board at the front of the house to the garage at the back. On a long run, cable size is set by voltage drop, not just current — which is exactly where cheap quotes cut corners.
Call 0411 498 916Street parking only
We’ll be straight with you: a home charger needs off-street parking. A lead run across the footpath is a trip hazard and not something we’ll install. If you’re planning to add a car space, we can wire for it in advance.
Call 0411 498 916The switchboard is already full
Very common in older homes and apartments. The board is upgraded first, then the charger circuit added. Two jobs, quoted as two, so you can see what you’re paying for.
Call 0411 498 916EV charger questions
What does EV charger installation cost?
The charger is a known price; the installation is what varies. A short run beside the switchboard is at the low end. A board upgrade plus a long submain to a rear-lane garage can be several times that. We look at the board and the car space, then give you a fixed price. Our cost guide has the detail.
Can my strata scheme stop me installing a charger?
Not on looks alone — since 1 July 2025, NSW owners corporations can’t refuse sustainability infrastructure such as EV charging on aesthetic grounds. They can still raise genuine technical, safety or cost concerns, which is why a properly scoped proposal matters. This is general information, not legal advice.
Do I need three phase power?
No. At 7kW, a single phase charger puts back roughly 40km of range for every hour plugged in — plenty to refill overnight. Three phase helps only if you often need a lot of range quickly, and only when both the building and the car can use it.
Can my switchboard take a charger?
That’s the first thing we check. It needs a spare position, enough supply capacity, and RCD protection suited to the charger. A lot of older Eastern Suburbs boards fall at the first of those.
Which chargers do you install?
The main brands. If you’ve already bought one, we’ll fit it, provided it’s compliant and right for your supply. If not, ask us first — we’ll tell you which features are worth paying for in your situation and which aren’t.
Can I just use the cable that came with the car?
It will work, slowly. But it draws close to a power point’s limit for hours at a stretch, on a circuit usually shared with other things and never designed for that. For regular home charging, give the car its own circuit.
What EV charger installation costs
You know what the charger costs. The variable is getting power to it — and distance is the biggest part of that.
| The job | Price |
|---|---|
| 7kW single phase charger, switchboard close byIts own circuit and RCBO, wall-mounted, set up and tested | $900 – $1,500 |
| 7kW single phase charger, average cable runCable through a ceiling or wall cavity — where most jobs land | $1,400 – $2,200 |
| Rear-lane garage or a long runCable sized so the voltage holds up over the distance. About $30–$50 for each extra metre | add $400 – $1,500 |
| New switchboard before the chargerWhen the board has no free positions or no RCDs. Shown as its own line | $1,500 – $3,500 |
| 22kW three phase, or load sharing for two carsWorth it only if the property is three phase and the car can take it | $2,500 – $5,000+ |
These are indicative market ranges for Sydney in 2026, not a quote. What you pay depends on your switchboard, access and what we find. We confirm a fixed price before starting, and it doesn’t move.
What customers say
Jason solved a really complex problem for our house with excellent professionalism and workmanship. Highly recommend, would def work with him again. On time delivery and within budget.
Excellent value and service, including follow-up.
Reliable and quality service.
These are Google reviews for Cync Electrical & Automation. 5.0 from 20 reviews. — see the profile
Thinking about charging at home?
A photo of your switchboard and your car space is all we need to start. Or call 0411 498 916.